Clean power for chemicals and process plants

Solar RESCO for Chemical Industry in India

GH2 Solar evaluates onsite rooftop and ground-mounted RESCO projects from 300 kW for eligible chemical, chlor-alkali, fertiliser and petrochemical facilities across India.

300 kWMinimum requirement
A- or better long-term credit ratingCredit eligibility
All IndiaService geography

Assessment covers the plant load profile, hazardous-area and process constraints, available roof or land, connection voltage and implementation schedule.

Sector assessment priorities

01

Match renewable generation against continuous and batch-process demand.

02

Review electrical interfaces, shutdown windows and site-safety constraints.

03

Build the commercial case from metered consumption, tariff and sanctioned load.

Primary references

These public sources explain the sector context. Project feasibility and commercial terms remain site and buyer specific.

  • BEE: Perform, Achieve and Trade — Primary reference for production-normalised industrial energy efficiency; checked 21 September 2026. Applicability is facility-specific.

Content updated: 21 September 2026

Project assessment

01

Eligibility

We check company, rating, location, demand and minimum capacity.

02

Feasibility

We review load, site or open-access fit, connectivity and implementation inputs.

03

Commercial proposal

A project-specific structure follows after technical, regulatory and financial review.

Size solar against the plant operating pattern

Separate continuous utility demand from batch operations, shutdowns and seasonal production. Share interval consumption where available, recent electricity bills and planned load changes. A rooftop area estimate alone cannot establish how much generation the plant can use.

Check the site before selecting equipment

Identify hazardous areas, chemical exposure, roof condition, fire access and cable routes before choosing installation locations. Engineering assessment should establish structural suitability, isolation arrangements and permitted work windows with the plant team. These checks are specific to the facility.

Keep energy efficiency and procurement distinct

BEE’s PAT framework measures specific energy consumption relative to production for designated consumers. Buying solar electricity and reducing process energy consumption are separate decisions. Define the commercial electricity objective alongside the plant’s efficiency programme without assuming a solar contract establishes regulatory compliance.

Frequently asked questions

Can solar supply a chemical plant through the night?

Solar generation varies with daylight and weather. The assessment must retain the required grid or other supply arrangements; a solar-only proposal is not a continuous-power guarantee.

Which sites can request a RESCO assessment?

GH2 evaluates onsite projects from 300 kW across India for buyers with A- or better long-term credit ratings. Roof or land suitability, consumption and commercial diligence still apply.

What should the plant share first?

Provide plant location, operating shifts, monthly and interval consumption, connection voltage, roof or land details and known hazardous-area restrictions. Avoid including confidential process recipes in the initial enquiry.

Qualified enquiry

Request an assessment

Complete the details below. GH2 Solar will review eligibility before issuing a commercial proposal.

For chemicals: include process type, shifts, shutdown windows, electricity demand and roof or land constraints. Eligibility is reviewed before any proposal.