GH2 Solar is developing an alkaline electrolyser manufacturing facility in India. The factory is under construction; project enquiries should confirm the proposed technology, supply arrangements and delivery schedule.
Factory status: under construction. GH2 Solar is developing its alkaline electrolyser manufacturing facility in India. Facility update authorised by GH2 management on 8 October 2026.
For buyers researching green hydrogen electrolyzer manufacturers in India, GH2 Solar's current position is a manufacturing facility under development in Morena, Madhya Pradesh. The planned technology is alkaline electrolysis. Commercial production readiness and delivery dates require project-specific confirmation.
SECI's official SIGHT Electrolyser Manufacturing Tranche II listing identifies GH2 Solar Private Limited, project EM-SIGHT-T2-B1-GH2SPL-105MW, with 105 MW annual manufacturing capacity awarded for alkaline electrolysers. This is an award record, not evidence of commissioned capacity. Source checked 15 October 2026.
The latest management update, received 8 October 2026, describes the factory as under construction. Phase 1 is targeted for 30 November 2026 and full-facility operations for 30 March 2027, subject to construction, equipment installation, testing and applicable approvals. SECI separately lists an SCD of 26 March 2027; this scheme date and management's full-facility target are different dates, neither a confirmation of commissioning.
Request a model-specific approved datasheet, the manufacturing and supply scope, test evidence, applicable certifications and a confirmed delivery schedule. Compare hydrogen output, power consumption, purity and pressure using the stated operating conditions and system boundary. A scheme award or factory rendering does not establish product performance.
The proposed facility is located in Morena, Madhya Pradesh. The supplied master plan identifies a 7.18-acre site, a 5,115 m² BOP shed and a 3,350 m² stacking shed. These are planned site and building areas, not evidence of commissioned manufacturing output.
The following site photographs supplied by GH2 management show building works, site preparation and the site boundary. They document construction activity and do not establish commissioning, installed production capacity or commercial manufacturing readiness. The date shown is the update received date; the photographs' capture dates have not been independently verified.
These management-supplied photographs show building structure, masonry, foundations and site works at the proposed Morena facility. The file names carry 18 October 2026; capture dates have not been independently verified. The facility remains under development. These photographs do not establish equipment installation, commissioning or commercial production.



AI-generated concept illustrations, not photographs of installed facilities. The exterior is based on the supplied architectural rendering. The assembly image is an illustrative concept: equipment, quantities and layout are not an approved engineering design or evidence of installed production capacity.


These management targets are subject to construction, equipment installation, testing and applicable approvals. The facility is currently under development; the Phase 1 operating scope and project-specific supply dates should be confirmed directly with GH2 Solar.
Planning reference: GH2 Solar proposed manufacturing facility, Morena, master plan Option 6, supplied by management. Renderings illustrate the proposed design and are not construction-progress photographs.
For a project enquiry, request confirmation of the proposed system specifications, manufacturing and supply arrangements, testing documentation and delivery schedule for your requirement.
Industrial alkaline electrolyser project requirements · Discuss an electrolyser project
GH2 Solar is developing alkaline electrolyser manufacturing in India. The facility is under construction. Local manufacturing output and localisation levels will depend on commissioning and verified production evidence.
The planned manufacturing facility is being developed with AHES technology collaboration. Request project-specific documentation covering technology scope, testing, applicable standards and manufacturing arrangements. The factory is not yet in operational production.
The system sizes shown below describe the proposed electrolyser range, not current output from the factory under construction. Confirm the configuration, supporting test data and supply schedule for each project.
Multi-MW projects require a project-specific configuration of electrolyser stacks, gas separation, purification and balance-of-plant equipment. Request a documented integration scope, layout, utility requirements and acceptance criteria. Manufacturing is under construction; supply arrangements and delivery schedules require confirmation.
Define hydrogen flow, purity, delivery pressure, operating profile and available power and water before selecting a system. Request a project-specific configuration and supporting test documentation. Proposed system sizes do not establish current factory output or a confirmed supply commitment.
Confirm technical values for the proposed model and operating conditions in a dated, approved datasheet. GH2 Solar’s manufacturing facility is under construction. Request the following before making a procurement decision.
Define the project-specific balance-of-plant scope, including gas separation, purification, water treatment, power conversion, cooling and controls where applicable. Confirm which items are included in the proposed supply package.
Request the separation-system scope, operating conditions and acceptance criteria.
Specify the purity and allowable contaminants required by the end use. Confirm purification scope, test methods and guaranteed conditions in the project documentation.
Confirm utility requirements, controls, safety interfaces and responsibilities for system integration.
Evaluate the proposed system against documented project requirements and supporting test evidence.
The GH2 Solar electrolyser factory is under construction. Manufacturing readiness, localisation and production output should be assessed against dated project evidence as development progresses. Request current documentation before making procurement decisions.
Discuss your hydrogen requirement, site conditions and procurement timetable with GH2 Solar. Request the proposed configuration, manufacturing and supply arrangements, supporting technical documents and delivery schedule. The electrolyser manufacturing facility remains under construction.