Ground-mounted solar project planning

Solar Parks and Industrial Power Procurement in India

Discuss solar-park project requirements with GH2 Solar, from land and grid interfaces to solar EPC scope and industrial power procurement. Each opportunity is assessed against its site, approvals, electricity buyer and delivery responsibilities.

Project specificMinimum requirement
Project and buyer diligenceCommercial review
IndiaService geography

For industrial power purchases, GH2 Solar evaluates open-access requirements from 1 MW in Maharashtra and Rajasthan for buyers with a BBB+ or better long-term credit rating. Availability and delivery dates require project-specific confirmation.

Sector assessment priorities

01

Land and access: establish site boundaries, title or lease position, access roads, topography and drainage before defining the buildable area.

02

Grid interface: identify the proposed connection point, evacuation route, metering boundary and the party responsible for each approval.

03

Plant scope: distinguish solar-generation EPC from common park infrastructure, external transmission works and long-term operations.

Primary references

These public sources explain the sector context. Project feasibility and commercial terms remain site and buyer specific.

Content updated: 19 September 2026

Project assessment

01

Eligibility

We check company, rating, location, demand and minimum capacity.

02

Feasibility

We review load, site or open-access fit, connectivity and implementation inputs.

03

Commercial proposal

A project-specific structure follows after technical, regulatory and financial review.

What is a solar park?

A solar park groups solar projects around shared infrastructure. MNRE describes facilities such as transmission connections, roads, water, drainage and communications. A project within a park still needs its own clearly defined generation scope and contractual interfaces. The term does not by itself establish that a particular site has land rights, approved connectivity or available capacity.

Choose the right enquiry route

A project developer needs an assessment of land, grid interfaces, plant design, execution scope and operations. An industrial electricity buyer needs a procurement assessment based on consumption and its drawal point. If your objective is to purchase power rather than develop a project, use the Maharashtra or Rajasthan PPA pages below. Onsite rooftop and ground-mounted projects are covered separately by the Solar RESCO page.

Define the scope before comparing proposals

Request a responsibility matrix covering land preparation, modules and inverters, civil works, pooling infrastructure, evacuation, metering, testing and operations. Identify exclusions and dependencies in each proposal. Compare generation assumptions at the same contractual delivery point, with losses, availability assumptions and any curtailment provisions stated consistently.

Information for an initial assessment

Provide the location, proposed AC and DC capacities, land information, current connectivity status, intended offtake route and target commissioning date. Where power will serve an industrial facility, include electricity bills, interval consumption, sanctioned demand and the drawal location. A requested start date is an input to diligence, not a delivery commitment.

Frequently asked questions

Does a solar park automatically qualify for open-access supply?

No. The generation project, grid connection, industrial buyer and applicable state requirements must be assessed together. A park location alone does not establish the buyer’s eligibility or the cost of delivered electricity.

Is GH2 Solar offering a government-approved park or subsidy here?

This page invites project assessments. It does not assert that a site is approved under an MNRE scheme or that financial assistance is available. Any such claim requires project-specific approval evidence and current scheme verification.

Can GH2 Solar quote available capacity or a commissioning date immediately?

Capacity, scope and timing are confirmed after project and buyer diligence. Submit your location, load or project size and intended start date so the relevant route can be assessed.

Qualified enquiry

Request an assessment

Complete the details below. GH2 Solar will review eligibility before issuing a commercial proposal.