Renewable electricity for digital infrastructure

Clean Power Solutions for Data Centres in India

GH2 Solar evaluates onsite Solar RESCO and eligible open-access solar supply for data-centre operators seeking long-term renewable electricity.

300 kW onsite / 1 MW open accessMinimum requirement
A- onsite / BBB+ open accessCredit eligibility
India; open access in MH and RajasthanService geography

Assessment covers critical-load profile, uptime requirements, power quality, redundancy, drawal location, onsite space and the role of storage or grid supply.

Sector assessment priorities

01

Use interval load data to size renewable supply against a continuous critical load.

02

Preserve the facility’s redundancy and power-quality requirements.

03

Define metering, open-access and backup interfaces before proposal development.

Primary references

These public sources explain the sector context. Project feasibility and commercial terms remain site and buyer specific.

  • MeitY Draft Data Centre Policy 2020 — The draft policy identifies uninterrupted, clean and cost-effective electricity, renewable procurement and open access as data-centre priorities.

Prepared by: GH2 Solar Clean Energy Team   Technical review: GH2 Solar Engineering Team   Last reviewed: 10 September 2026

Project assessment

01

Eligibility

We check company, rating, location, demand and minimum capacity.

02

Feasibility

We review load, site or open-access fit, connectivity and implementation inputs.

03

Commercial proposal

A project-specific structure follows after technical, regulatory and financial review.

Qualified enquiry

Request an assessment

Complete the details below. GH2 Solar will review eligibility before issuing a commercial proposal.