Design basis
Document the intended application, hydrogen demand and quality, operating profile, site conditions and available utilities.
Industrial hydrogen project delivery
GH2 Solar evaluates engineering, procurement and construction requirements for industrial green-hydrogen projects across India.
Feedstock, power, water, hydrogen specification, storage, compression, offtake and site interfaces are assessed before scope and schedule are proposed.
Before requesting an EPC proposal, define the boundaries between renewable power, water treatment, hydrogen production, compression, storage and downstream use. Agree which engineering documents, equipment packages, approvals, tests and handover records are included in the proposed scope.
Document the intended application, hydrogen demand and quality, operating profile, site conditions and available utilities.
Identify what the buyer, equipment supplier and EPC contractor are each expected to provide. Record exclusions and responsibility for connections between packages.
Agree performance-test conditions, required documentation, operator training and handover criteria in the project-specific proposal.
This is a buyer's scope checklist. Inclusion of any package in GH2 Solar's proposed scope requires technical and commercial agreement.
For equipment inputs, see the industrial alkaline electrolyser assessment, then request a project assessment.
Content updated: 8 October 2026
We check company, rating, location, demand and minimum capacity.
We review load, site or open-access fit, connectivity and implementation inputs.
A project-specific structure follows after technical, regulatory and financial review.
Qualified enquiry
Complete the details below. GH2 Solar will review eligibility before issuing a commercial proposal.