Solar power for cement operations

Renewable Power for Cement Industry in India

GH2 Solar evaluates onsite RESCO projects from 300 kW across India and open-access solar requirements from 1 MW in Maharashtra and Rajasthan for eligible cement facilities.

300 kW onsite / 1 MW open accessMinimum requirement
A- onsite / BBB+ open accessCredit eligibility
India; open access in MH and RajasthanService geography

The project route is selected after reviewing the grinding or integrated-plant load, operating pattern, roof or land, drawal point and current power cost.

Sector assessment priorities

01

Separate stable process demand from seasonal or shift-related variation.

02

Compare onsite generation and open-access supply against the same load baseline.

03

Record metering, connectivity and operating constraints before commercial design.

Primary references

These public sources explain the sector context. Project feasibility and commercial terms remain site and buyer specific.

  • IEA: Cement (2023) — Primary context on raw-material and high-temperature heat emissions; checked 21 September 2026.

Content updated: 21 September 2026

Project assessment

01

Eligibility

We check company, rating, location, demand and minimum capacity.

02

Feasibility

We review load, site or open-access fit, connectivity and implementation inputs.

03

Commercial proposal

A project-specific structure follows after technical, regulatory and financial review.

Distinguish grinding from integrated operations

Identify the electrical load at the specific facility: grinding, material handling, auxiliaries or an integrated works. Include existing captive generation, waste-heat recovery and planned maintenance when describing net grid demand. The assessment should use the electricity remaining to be supplied after those sources.

Choose onsite or open access from site evidence

Onsite RESCO requires suitable roof or land and an electrical interface. Open-access evaluation requires the drawal point, voltage and state eligibility. Compare both against the same load data and operating assumptions; plant size alone does not determine the preferred procurement route.

Define the emissions boundary accurately

The IEA identifies raw materials and high-temperature heat as major challenges in cement decarbonisation. Renewable electricity procurement addresses an electricity requirement; it does not by itself remove kiln fuel or raw-material process emissions. Keep those workstreams separate in the plant’s transition plan.

Frequently asked questions

What are the entry criteria?

Onsite RESCO starts at 300 kW across India with an A- or better long-term credit rating. Open-access assessment starts at 1 MW in Maharashtra and Rajasthan with BBB+ or better. Site and commercial diligence remain necessary.

Can a grinding unit request an assessment?

Yes, within the stated eligibility criteria. Share its own metered electricity profile rather than the total consumption of a wider cement group.

What information is needed where captive power already exists?

Share net grid purchases, the captive generation profile, planned outages and relevant operating constraints so the assessment avoids treating already-supplied demand as a new requirement.

Qualified enquiry

Request an assessment

Complete the details below. GH2 Solar will review eligibility before issuing a commercial proposal.

For cement: identify grinding or integrated operations, existing captive or waste-heat generation, net grid demand and available site area.